Project and Programme Management

A project is won at framing, not at delivery.

A project that drifts has almost always done so from the start: blurred scope, undefined benefit, absent sponsor. Aegryn frames your projects and programmes, arbitrates the portfolio, then installs governance and leads delivery with your teams.

What we observe

+45% / −56%

large IT projects (over USD 15M) overrun their budget by 45% on average and deliver 56% less value than expected

McKinsey and University of Oxford, 2012

18%

of project professionals have a high level of business acumen; teams that do meet their objectives in 83% of cases, versus 78%

PMI, Pulse of the Profession, March 2025

24 reports

from the Swiss Federal Audit Office on the Confederation’s key IT projects (2024-2025): incomplete planning, poorly explained usefulness, badly prepared handover to operations. “The same mistakes as ten years ago”

SFAO, 8 July 2026

All three findings say the same thing: execution is rarely the problem. The causes lie upstream: a benefit that was never costed, a scope that keeps moving, an operations handover that was never prepared.

These mistakes do not depend on size: the federal administration has repeated them for ten years, and an SME pays for them sooner, lacking the margin to absorb the drift.

What this changes

A project-management method is not enough. You need a framing that names the expected benefit, a decider who rules, and a threshold at which you stop or correct.

What you get

01

A framed project: costed benefit, scope, decider and stop criteria.

02

A light governance that produces decisions, not just reports.

03

A delivery that goes live, with a team ready to take it over.

Six situations

Where you stand. How we step in.

01

« We have too many projects running in parallel, and nothing moves. »

Decision

Which to continue, pause or stop.

Deliverable

A prioritised portfolio review, with capacity and benefit per project.

A few weeks

02

« An important project is starting: how do we launch it properly? »

Decision

Which scope, which benefit, which decider.

Deliverable

Framing note: benefit, scope, milestones, budget, risks, stop criteria.

A few weeks

03

« Our project is drifting (deadline, budget, quality). »

Decision

Correct, rescope or stop.

Deliverable

Turnaround diagnosis and a thirty-day recovery plan.

Two to four weeks

04

« We are launching a transformation that touches several teams. »

Decision

How to govern, who decides, at what pace.

Deliverable

Governance model: bodies, roles, reserved decisions, dashboard.

One to two months

05

« The vendor or integrator is not keeping its commitments. »

Decision

Renegotiate, reinforce or replace.

Deliverable

Review of the contract and delivery plan, with costed options.

A few weeks

06

« The project is delivered, but nobody uses it. »

Decision

How to succeed in the handover to operations.

Deliverable

Operations transfer plan: acceptance criteria, training, responsibilities.

A few weeks

What we do: deciding (Frame)

  • 01Write the framing note for a project or programme: benefit, scope, milestones, budget, risks.
  • 02Assess and prioritise the project portfolio by benefit and capacity.
  • 03Define the governance model: bodies, roles, decision thresholds.
  • 04Diagnose a struggling project and recommend: correct, rescope, stop.
  • 05Review a contract or delivery plan with a vendor or integrator.
  • 06Define acceptance criteria and the transfer plan to operations.

Our framework

The Three-Question Test

Before launching, continuing or stopping a project, three questions, in writing.

What benefit?

Measured how, and by when? Without a figure, the project is not framed.

Who decides?

A name, not a committee.

At what signal do we stop?

A threshold set before starting, not after.

Deliverable

The framing note: three written answers, signed by the decider.

Implement

Implementing what was decided, through to acceptance.

  1. 01

    Set up the project office (PMO): minimal method, dashboard, routines.

  2. 02

    Lead a project or programme with management: milestones, risks, arbitration, reporting.

  3. 03

    Lead a turnaround plan: recovering schedule, budget and vendor relationship.

  4. 04

    Accept and transfer to operations: acceptance tests, training, handover to the teams.

A part-time project director can reinforce the team: this assignment runs through Talent (interim profiles).

Engagement modes: we deliver, we deliver with experts, or we coordinate experts of your choosing.

Confidential scoping call

Thirty minutes with a named expert from our network, accountable for their scope. No commitment at this stage; terms follow the scoping call.

Book 30 minutes

Newsletter · Built to Last

Market analysis, company lifecycles, lessons from the field. One letter, no prospecting.